New train ring. New metro scheme - MKZh. About the MCC project

The MCC is the Moscow Central Circle, a new stage in the development of the capital’s transport infrastructure. Convenient and fast transport for moving, especially to those microdistricts where there are no metro lines. You can deal with complex transport interchanges on a special website that has all the necessary information.

Metro and MCC map

It's a little lower on the page. Before this, you can read the text part where you can find out about the fare, stations and operating hours. The diagram itself is very detailed and convenient to work with. To zoom in, click on the map.

MCC and metro map

Here you can see the metro map with all the interchange nodes, as well as the MCC map with stops and transfers. Below is a readable legend of all symbols, thanks to which working with the circuit becomes even easier.

Symbols on the diagram

The map shows:

  • branches and stations of the Moscow metro;
  • MCC stops;
  • railway and bus stations, airports;
  • intercept parking.

Scheme of the MCC with interchange hubs for suburban transport

This is the following diagram of the MCC, which shows the places of transfers and the route of suburban electric trains. The map indicates current and planned transfer points between the MCC and suburban trains.

Transfer scheme for the MCC and suburban electric trains

The signage and interchange stations are divided into three commissioning phases:

  • Stage 1 – September 2016;
  • Stage 2 – end of 2016
  • Stage 3 – 2018.

Information on transfer operations is reflected in great detail, from the distance and approximate time for a transfer to additional information on the type of station.

Information about transfer stations

Plans for the development of this transport and the location of new transfer stations are also indicated.

Diagram of interchange hubs between the MCC and NGT

This diagram shows connections with ground urban transport. Everything is very informative and detailed here you can see for each transfer station:

  • type of ground transport;
  • transport route;
  • movement interval.

Fragment of a map diagram of interchange hubs of the MCC and ground urban transport

The average time to a particular station or route is written near each station. The main transport facilities (stations, airports) are indicated. Working with the map is simple, but lacks more interactivity.

This information will be very useful for both city guests and residents of the capital. Convenient maps are worth saving to your mobile phone and using to navigate around the city. This will significantly reduce travel time and find calmer and more convenient travel options. This is especially important during rush hour and Friday crowds.

Search and create public transport routes that are optimal for you FROM your location to the desired street or house, as well as car, bicycle and walking routes for walking.

Choose transport:

Public transport By car Bicycle On foot

Show route on map

Route on the city map.

Are you asking where you can get or how to get to a certain street or house in Moscow? The answer is very simple, find your optimal route around the city using the trip planner on our website. Our service will find for you up to 3 options for travel around the city of Moscow FROM your address to your destination. On the map with routes, click the more details button (the start icon) and go to a detailed description of travel options. For all routes, travel time will be shown taking into account traffic jams, numbers of buses, minibuses and other public transport.

Popular routes:

  • FROM: Moscow, metro station Vykhino - TO: Moscow, Mozhaiskoe highway, 45A;
  • FROM: Moscow, Leningradsky station - TO: Moscow, Molodezhnaya street;
  • FROM: Moscow, Pervomaiskaya street, 5 - TO: Moscow, Moskovsky prospect;
  • FROM: Moscow, Lyublinsko-Dmitrovskaya line, Lyublino metro station - TO: Moscow, Moscow Central Circle, Baltiyskaya station;
  • FROM: Moscow, Artamonova street, 7k1 - TO: Moscow, Mosfilmovskaya 1 st. 28;

Users of our site often ask, for example: “How to get from the bus station to the hospital?” and so on. We decided to make it easier for everyone to find the optimal route.

Driving along a pre-designed route is a way to eliminate problems that may arise in unfamiliar areas and overcome the desired section of the road as quickly as possible. Don’t miss out on details; check the map in advance for directions on the road and turns.

Using the trip planning service, you just need to enter the beginning and end of the route, then click the “Show route on the map” button and you will receive several route options. Choose the most suitable one and start moving. Four modes of route planning are possible - by city public transport (including minibuses), by car, by bicycle or on foot.

MCC and Moscow metro map 2018

Moscow Central Circle and metro map

Scheme of the Moscow Central Circle


MCC station map

MCC station diagram on the map of Moscow


MCC station diagram on the map of Moscow

Moscow Central Interchange Ring

free MCC transfers

Helpful information

No matter how banal it may sound, the pace of human life is accelerating day by day. A person is constantly in a hurry to somewhere: to work, to school, to university. In addition to proper time management, a well-functioning transport system helps you get everything done. One of its parts is the MCC or Moscow Central Circle.

History and layout of the MCC

In the past, the ring had a different name - the Moscow Circular Railway. The first mentions of it date back to the end of the 19th century, a time when the industrial boom was actively developing. Back then, goods were transported using dray cabs. The process required a lot of effort and time. That is why tycoon F.I. Chizhov proposed the idea of ​​​​building a ring road. On the one hand, it was just in time. But on the other hand, a number of problems arose.

As it turned out, the state owns only 5% of all railways. All others are private property. Each has its own rules and prices. It took a lot of time to resolve this issue. But by the end of the 19th century, most of the roads became state-owned.

The order for the construction of the Moscow Circular Railway was given by Emperor Nicholas II on November 7, 1897. The commencement ceremony took place on August 3, 1903.

Moscow MCC map of those times included several objects:

  • 22 branches connecting to the main railway tracks;
  • 14 stations;
  • 2 stopping points;
  • 3 telegraph posts;
  • 72 bridges, including those that cross the Moscow River;
  • 30 overpasses;
  • 185 culvert structures;
  • 19 buildings for passengers;
  • 30 houses;
  • 2 houses for employees;
  • 2 baths;
  • 2 reception rooms.

The work was carried out under the supervision of the best Russian engineers and architects. These include N. A. Belelyubsky, L. D. Proskuryakov, A. N. Pomerantsev.

Now MCC station map looks like that:

  • 31 stations;
  • 17 stations for transfer to other metro lines;
  • 10 stations for transferring to trains.

More than 200,000,000,000 rubles were spent on the construction of the structure. The total length of roads is 54 km. The round trip will take 84 minutes. Each train running between stations can accommodate 1,200 passengers.

Moscow metro map with MCC, trips and statistics

In fact, the MCC is part of the Moscow metro. In the documents it is designated as the Second Ring Line of the metro. This transport system is inextricably linked with it in the form of fares and transfers. On metro maps, routes are indicated by a white line with a red border. Each of them has the signature of the MCC and a serial number.

Transportation is carried out by more than three dozen Lastochka trains. Each of them accommodates 1,200 people. The maximum speed reaches 120 km/h, but the operating speed will remain at 40-50 km/h. Train intervals range from 5 to 15 minutes. It all depends on the time of day. During rush hour they will travel more often.

All Lastochkas are equipped with soft seats and climate control systems. Passengers have the opportunity to connect to WI-FI and even charge their gadgets.

Trains do not have vestibules. However, their wide double doors make it easy to transport passengers with limited mobility.

MCC has a lot of features and nuances. The figures below will help you see how ambitious the idea for its construction was.

  1. The ring road, which later became the MCC, was built 111 years ago.
  2. 130 pairs of trains pass here every day.
  3. To establish regular traffic, the state had to spend more than 70 billion rubles.
  4. Thanks to the work of the MCC, the Koltsevaya metro line has been decongested by 15%.
  5. In the first year, 75 million people were transported by Lastochkas.
  6. MCC provided citizens with 40,000 jobs.
  7. There are car parks near most of the stations.
  8. According to the plan, trains will be able to transport more than 300,000,000 people within a year.

Thanks to the ring, it was possible to significantly relieve urban transport.

So, MCC is a good alternative to cars. This is the absence of traffic jams, affordable travel costs and the ability to be punctual. Metro map with MCC will show how and at which station you can transfer to a train in the desired direction, and the availability of parking lots and convenient transition to the station will save both time and effort.

Reconstruction of the Moscow Central Circle (MCC)- a unique project not only for Moscow, but also for Russia as a whole. The MCC has become a full-fledged light metro, integrated into the metro system.

The MCC map is included in the capital's metro map. It shows the approximate time of ground transfers from the MCC.

In addition, the diagram indicates possible transfers from the MCC to ground urban transport, traffic intervals, etc.

Traffic around the ring was launched on September 10, 2016. This gave a new impetus to the development of abandoned industrial areas of the capital, and also made it possible to cut the Gordian knot of transport problems hanging over the capital.

The Moscow Central Circle is the road to the future. Thanks to the ring, trips around the capital take an average of 20 minutes. Another unique feature of the MCC was that it connected the capital’s garden and park ensembles: the Mikhalkovo estate, the Botanical Garden, the territories of VDNKh and the Elk Island National Park, the Vorobyovy Gory nature reserve and others.

MCC is a new life for industrial zones of Moscow

Since 1908, the Moscow Central Circle served industrial zones and mainly performed the function of transporting goods. However, over time, many industrial areas around this ring fell into disrepair, and some industries closed. A number of industrial zones were, at best, used for warehouses. Now these territories are being actively reorganized, housing with social facilities, sports complexes, etc. are being built here. And developing territories require convenient transport connections.

The launch of passenger traffic along the MCC resolves the issue of transport support for industrial zones. In addition, the ring connected suburban trains and electric trains that go to the city center with MCC stations. Passengers can, before reaching the city center, transfer to MCC trains and move further throughout almost the entire territory of Moscow.

All MCC stations were built as transport hubs (TPU). They will include offices, shopping malls, shops and cafes. This concept meets both the interests of investors, for whom it is important to recoup investments in construction, and the needs of citizens.

Moscow Central Circle (MKR) station diagram, interactive MCC station diagram on the map, detailed information, train schedule.

Interactive map of the Moscow Circle Railway (MCC map) and metro transfer stations, MCC train schedule

MCC fare

Tariffs for travel on the Moscow Central Circle (MCC).
Ticket for one and two trips to the MCC: the same as on the metro - 55 and 110 rubles, respectively.
Directions for card users “Troika” on the MCC – 38 rubles.
Single ticket for 20 trips – 747 rubles, 40 trips - 1494 rubles, 60 trips - 1900 rubles, Valid for 90 days, including the day of sale.

AT ALL MCC AND METRO STATIONS YOU CAN PAY YOUR FARE WITH A BANK CARD!

    Transfers from the metro to the Moscow Central Circle and back are carried out without charging an additional fee.
    The exception is transfers between stations Dubrovka MCC and Kozhukhovskaya metro station, as well as between stations Verkhnie Kotly MCC and Nagatinskaya metro station.

MCC operating schedule and train intervals

Trains operate on the MCC daily from 05:45 to 01:00 Moscow time.

  • Weekdays: during rush hour 5 minutes. – (from 7:30 to 11:30 Moscow time and with 16:00 to 21:00 Moscow time)
  • Weekends: during rush hour 6 min. – (from 13:00 to 18:00 Moscow time) and 10 minutes during off-peak times.

In accordance with the new schedule of the MCC, Lastochka makes 354 flights on weekdays, and 300 on weekends. For the convenience of passengers, at 12 stop points with the highest passenger traffic, the stop time of the train has been increased from 30 seconds to 1 minute.

These are the platforms “Andronovka”, “Lokomotiv”, “Rostokino”, “Botanical Garden”, “Vladykino”, “Okruzhnaya”, “Panfilovskaya”, “Business Center”, “Kutuzovskaya”, “Gagarin Square”, “Zil”, “ Avtozavodskaya". Thus, travel time on the MCC will increase from 84 to 90 minutes.

MCC train schedule

Detailed description of stations of the Moscow Central Circle.

KHOROSHEVO - SORGE - PANFILOVSKAYA - STRESHNEVO - BALTIC - KOPTEVO - LIKHOBORY - DISTRICT - VLADYKINO -BOTANICAL GARDEN-ROSTOKINO -BELOKAMNAYA -BOULEVARD-ROKOSSOVSKOGO-LOCOMOTIVE -IZMAILOVO -SOKOLINAYA MOUNTAIN -THE ENTHUSIAST HIGHWAY-ANDRONOVKA -NIZHNOGORODSKAYA -NOVOKHOKHOLOVSKAYA -UGRESHSKAYA -DUBROVKA -AVTOZAVODSKAYA -ZIL -UPPER BOILERS -CRIMEASKAYA -GAGARIN SQUARE-LUZHNIKI -KUTUZOVSKAYA -BUSINESS CENTER -SHELEPIKHA

Train schedule at TPU Khoroshevo station

– located in the Northern and Northwestern administrative districts of Moscow, within the boundaries of the Khoroshevo-Mnevniki and Khoroshevsky districts.

The main planning and transport connections of the territory are the MCC, Marshal Zhukov Avenue, 3rd Khoroshevskaya Street and Khoroshevskoye Highway.

The Khoroshevo transport hub is planned to provide a transfer to ground urban passenger public transport. It is planned to construct new stopping points with drive-in pockets for public transport on 3rd Khoroshevskaya Street and Marshal Zhukov Avenue.

To the east of this site Polezhaevskaya metro station is within walking distance Tagansko-Krasnopresnenskaya line.

The transport hub includes the construction of northern and southern passenger terminals, an overground pedestrian crossing with service facilities and a stopping point, consisting of a coastal and island platform, while the platforms are partially located directly on the overpass over the Khoroshevskoe highway and structurally form a single whole with it

Transport:

Train schedule TPU Sorge

TPU "Sorge"– located in the Northern and Northwestern administrative districts of Moscow, within the boundaries of the Khoroshevo-Mnevniki, Shchukino, Sokol and Khoroshevsky districts.

The main planning and transport connections of the territory are the MCC, Sorge, Berzarina, Marshala Biryuzova, 3rd Khoroshevskaya and Kuusinen streets. There is a station not far from the planned territory "October Field" Moscow metro.

The Sorge transport hub will provide a transfer to ground urban passenger transport. For this purpose, it is planned to construct a settling-turning area, construct new stopping points, with drive-in pockets for public transport on Sorge and Marshal Biryuzov streets.

Transport:

  • Buses No. 48, 64, 39, 39k
  • Trolleybuses No. 43, 86, 65

Train schedule TPU Panfilovskaya

TPU "Panfilovskaya" located in the Northern and Northwestern administrative districts of Moscow, within the boundaries of the Sokol and Shchukino districts.

It is planned to organize a convenient transfer from the Moscow Ring Railway to buses and trolleybuses stopping on nearby streets - Panfilov, Alabyan and Narodnogo Opolcheniya. It is planned to install new stopping points with drive-in pockets for public transport along Panfilov Street. Three elevated pedestrian crossings, passenger platforms on the MCC, exits to the platforms, premises for ticket offices and turnstiles are also being built.
The Panfilovskaya transport hub is located within walking distance from the Oktyabrskoye Pole station. Tagansko-Krasnopresnenskaya line of the Moscow metro.

Transport:

  • Buses No. 100, 105, 26, 691, 88, 800
  • Trolleybuses No. 19, 59, 61

Train schedule TPU Streshnevo

– located in the Northern and Northwestern administrative districts of Moscow, within the boundaries of the Sokol, Voikovsky, Shchukino and Pokrovskoye-Streshnevo districts.

The main planning and transport connections are the Moscow Circle Railway, the Riga direction of the Moscow Railway, 1st Voykovsky, Svetly and 1st Krasnogorsky passages, Konstantin Tsarev Street and Volokolamskoye Highway.

In 2017 a transfer to the Riga direction will be organized from the Streshnevo transport hub Moscow Railway, for which a new stopping point Streshnevo will be built. By the time passenger rail traffic on the MCC is launched, a transfer will be organized from the Volokolamskaya stopping point to ground urban passenger transport, settling and turning areas will be arranged, and new stopping points will be organized with the construction of drive-in pockets along the 1st Krasnogorsky Passage and Volokolamsk Highway.

Transport:

  • Buses No. 88
  • Trolleybuses No. 12, 70, 82
  • Trams No. 23, 30, 31, 15, 28, 6
  • Suburban railway transport Pl. Streshnevo (Riga direction of the Moscow Railway, promising, 2017)

Train schedule TPU Baltiyskaya

– located in the Northern Administrative District of Moscow within the boundaries of the Voikovsky district. The main planning and transport connections are Leningradskoye Highway, Admiral Makarov, Klara Zetkin streets, Novopetrovsky Proezd, 4th Novopodmoskovny Lane and Zoya and Alexander Kosmodemyansky Street.

The Baltiyskaya transport hub is located near the Voikovskaya station of the Zamoskvoretskaya line Moscow metro, and provides transfer to the metro. There will also be a transfer to city passenger transport (bus, trolleybuses and minibuses). It is planned to build settling and turning areas and construct new stopping points for ground urban passenger transport along Admiral Makarov Street and Novopetrovsky Proezd. In the future, an overground pedestrian crossing will be built from Admiral Makarov Street to Novopetrovsky Proezd over the railway tracks.

From the pedestrian crossing there will be exits on both sides of the Baltiyskaya stopping point. The elevated pedestrian crossing will be connected to the Metropolis shopping center, from where it will be possible to access the metro. At the same time, a transition from the MCC to the metro and along the road network will be organized.

Transport:

Car parking: Number of parking spaces: 1000, year of construction: 2025

Train schedule TPU Koptevo

– located in the Northern Administrative District of Moscow within the boundaries of the Golovinsky and Koptevo districts. The main planning and transport connections are Koptevskaya, Mikhalkovskaya, Onezhskaya streets and Cherepanov passage. At the intersection of the listed planning connections in the Mikhalkovskaya interchange area there is a tram ring of routes running from the Voikovskaya and Timiryazevskaya stations.

The transport hub project provides for the construction of a turnstile and ticket office pavilion, an elevated pedestrian crossing, providing access to the tram ring and public transport boarding fronts on the street. Mikhalkovskaya.

Transport:

  • Buses No. 123, 621, 90, 22, 72, 801, 87
  • Trams No. 23, 30

Train schedule TPU Likhobory

– located in the Northern Administrative District of Moscow within the boundaries of the Koptevo, Golovinsky, Western Degunino and Timiryazevsky districts.

The main planning and transport connections are the MCC, Oktyabrskaya Railway, Cherepanov Passage, Oktyabrskaya Railway Line Street and Likhoborskaya Embankment.

By the time passenger rail traffic on the MCC is launched, a transfer will be organized from the MCC station "Likhobory" to the NATI platform, as well as to ground urban passenger transport: the construction of a settling and turning area, the construction of new stopping points along Cherepanov Passage.
Transport:

  • Buses No. 114, 123, 179, 204, 87
  • Trolleybuses No. 57
  • Suburban railway transport Pl. NATI (Leningrad direction of Railways)
  • Car parking: Number of parking spaces: 200, Year of construction: 2017

Train schedule TPU Okruzhnaya

– located in the North-Eastern and Northern administrative districts of Moscow, within the boundaries of the Marfino, Otradnoe, Timiryazevsky and Beskudnikovsky districts. The main planning and transport connections are the MCC, the Savelovskoe direction of the Moscow Railway, Lokomotivny and 3rd Nizhnelikhoborsky passages and Station Street.

TPU "Okruzhnaya" will provide transfer to the eponymous stopping point of the Savelovsky direction of the Moscow Railway and on promising station "Okruzhnaya" Lyublinsko-Dmitrovskaya line of the Moscow metro (opening in 2017). It will also be possible to transfer to ground urban passenger transport.
Transport:

Train schedule TPU Vladykino

– located in the North-Eastern administrative region, districts: “Otradnoye” and “Marfino”. The Vladykino transport hub will provide a transfer to the Vladykino station Serpukhovsko-Timiryazevskaya line of the Moscow metro, as well as on ground urban passenger transport. An elevated pedestrian crossing will lead from the MCC platforms, which will go to the southern and northern lobbies of the Vladykino metro station.

The TPU project provides for the construction of an MCC station with the installation of ticket offices and turnstiles, an elevated pedestrian crossing over the railway, which will connect the southern and northern metro lobbies. It is also planned to build a settling and turning area for ground urban passenger transport.
Transport:

Train schedule TPU Botanical Garden

TPU "Botanical Garden"– located in the North-Eastern administrative district of Moscow in the Sviblovo, Ostankino and Rostokino districts. The main planning and transport connections are the passage and Serebryakova street, st. Wilhelm Pieck, 1st Leonov Street.

The Botanical Garden transport hub is located in close proximity to the Botanical Garden station. Moscow metro and will be connected to it by an underground pedestrian crossing. An underground pedestrian crossing will run under the railway and connect Serebryakov Passage and 1st Leonov Street.
Transport:

Train schedule TPU Rostokino

TPU "Rostokino"– located in the North-Eastern administrative district of Moscow. The territory borders the Yaroslavsky, Rostokino and Sviblovo districts.

The main planning and transport connections are Mira Avenue, Yaroslavskoe Highway, Severyaninsky Overpass.
The Rostokino transport hub will provide a transfer to the Severyanin stop point Yaroslavl direction of the Moscow Railway, as well as for ground urban passenger transport: reconstruction of existing and construction of new stopping points, construction of a settling and turning area along Mira Avenue towards Letchika Babushkina Street.
Transport:

  • Buses No. 136, 172, 244, 316, 317, 388, 392, 425, 451, 499, 551, 576, 789, 834, 93
  • Trolleybuses No. 14, 76
  • Trams No. 17
  • Suburban railway transport Pl. Severyanin (Yaroslavl direction of the Moscow Railway)

Train schedule TPU Belokamennaya

TPU "Belokamennaya"– located: Eastern administrative district of Moscow, within the boundaries of the Losiny Ostrov National Park. The entire territory is located within the boundaries of the Bogorodskoye and Metrogorodok districts.

The main planning and transport connections are the MCC, Yauzskaya Alley, Losinoostrovskaya Street and Abramtsevskaya Clearing.

The nearest metro station is the Rokossovsky Boulevard station Sokolnicheskaya metro line, which is located at the intersection of Ivanteevskaya Street and Otkrytoye Shosse. Transport services for the population and working areas of Bogorodskoye and Metrogorodok of the Eastern Administrative District are currently provided by ground public transport with delivery to the Rokossovsky Boulevard station.

The Belokamennaya transport hub will provide a transfer to ground urban passenger transport. For this purpose, it is planned to construct a turning area for public transport on Yauzskaya Alley street.
Transport:

Train schedule TPU Rokossovsky Boulevard

– located in the Eastern Administrative District of Moscow within the boundaries of the Bogorodskoye and Metrogorodok districts. The main planning and transport connections are the MCC, Otkrytoye Shosse and Ivanteevskaya Street.

The transport hub "Rokossovskogo Boulevard" is located near the existing "Rokossovskogo Boulevard" station Sokolnicheskaya line of the Moscow metro, and provides for a transfer to the latter. A transfer to ground urban passenger transport will also be provided.

For this purpose, it is planned to build a settling-turning area and construct boarding fronts for urban passenger transport along Otkrytoye Highway, 6th Podbelsky Passage and Ivanteevskaya Street.
Transport:

Train schedule TPU Lokomotiv

– located in the Eastern Administrative District of Moscow, within the boundaries of the Preobrazhenskoye, Golyanovo and Izmailovo districts.

The Lokomotiv transport hub is located near the existing Cherkizovskaya station Sokolnicheskaya line of the Moscow metro, and provides for transplantation to the last one. There will also be a transfer to city passenger transport (bus, trolleybus and minibus). Pedestrian connections are provided with the southern vestibule of the Cherkizovo metro station.


The transplant is carried out according to the “dry legs” principle. The construction of a turning circle for ground transport and the construction of new boarding fronts for ground urban passenger transport along Okruzhny Proezd near the pavilions of the Cherkizovskaya metro station are underway.

Transport:

Train schedule TPU Izmailovo

– located in the Eastern Administrative District within the boundaries of the Izmailovo, Sokolinaya Gora and Preobrazhenskoye districts.

The transport hub will unite Izmailovskoe highway, Okruzhnoy proezd(one of the sections of the North-East Expressway), station "Partizanskaya" Arbatsko-Pokrovskaya line of the Moscow metro and Projected passage No. 890.

The Izmailovo platform on the MCC and the Partizanskaya metro station will be connected by an elevated pedestrian crossing, which will stretch from Okruzhny Passage over the roadway of the North-Eastern Expressway and connect the Izmailovo MCC station and the Partizanskaya metro station of the Arbatsko-Pokrovskaya line. The two passage lobbies will contain ticket offices, sanitary rooms and elevators. An MCC terminal with turnstiles and escalators for passengers to exit to the platforms will be built at the transport hub.
Transport:

Train schedule TPU Sokolinaya Gora

– located in the Eastern Administrative District of Moscow. The planned territory is located within the boundaries of several districts: Sokolinaya Gora and Izmailovo. The metro stations closest to the transport hub are Partizanskaya and Shosse Entuziastov.

On the eastern side of the transport hub there is a specially protected area of ​​the Izmailovo natural and historical park. On three sides, the territory is framed by existing streets and passages (Okruzhny Passage, 8th Sokolinaya Gora Street, Electrodny Passage and the overpass between them, located along the southern border).
Transport:

  • Buses: No. 86
  • Car parking: Number of parking spaces: 365 Year of construction: 2016

Train schedule TPU Shosse Entuziastov

– located in the Eastern Administrative District of Moscow, in the Sokolinaya Gora district, a small area is located within the boundaries of the Perovo district.

The main planning and transport connections are the MCC, the North-Eastern Expressway under construction, Entuziastov Highway, st. Utkina. In the southern part of the projected area, on both sides of Entuziastov Highway, there are exits from the Entuziastov Highway metro station. Passengers will exit the MCC platform into an underground pedestrian crossing that connects Utkina Street and Enthusiastov Highway.
Transport:

Train schedule TPU Andronovka

– located in the South-Eastern Administrative District in the Lefortovo and Nizhegorodsky districts and the Eastern Administrative District in the Perovo district.

The main planning and transport connections are Freser highway, Andronovskoe highway, st. 2nd Frezernaya, 1st Frezernaya st., ave. Fraser, st. 5th Cable, st. Pond-Klyuchiki.
The Andronovka transport hub will provide a transfer to the Freser railway platform Ryazan direction railway and ground urban passenger transport with transportation to the Aviamotornaya station of the Kalininskaya metro line.
Transport:

  • Suburban railway transport Pl. Frezer (Kazan direction of Moscow Railways)
  • Car parking: number of parking spaces: 60 Year of construction: 2016

Train schedule TPU Nizhegorodskaya

– located in the South-Eastern district of Moscow. Its main part is located within the boundaries of the Lefortovo and Nizhny Novgorod districts. The main planning and transport connections are Ryazansky Prospekt, Frazer Highway and Kabelnaya Street.

TPU "Nizhegorodskaya" will provide a transfer to the stop point "Karacharovo" Gorky direction of the railway, as well as to ground urban passenger transport. In 2018 This transport hub will include the Nizhegorodskaya Street station Kozhukhovskaya line of the Moscow metro.

Transport:

Train schedule TPU Novokhokhlovskaya

– located in the South-Eastern Administrative District in the Tekstilshchiki and Nizhegorodsky districts.

Currently, the main planning and transport connections are: Third Transport Ring, st. Novokhokhlovskaya, st. Nizhnyaya Khokhlovka.

The Novokhokhlovskaya transport hub, after the launch of traffic along the MCC, will provide a transfer to ground urban passenger transport. In 2017 from this transport hub there will be a transfer to the Kursk direction of the Moscow Railway, for which a new platform will be built.

Transport:

  • Buses No. 106, new routes
  • Suburban railway transport Pl. Novokhokhlovskaya (Kursk direction of the Moscow Railway, promising, 2017)

Train schedule TPU Ugreshskaya

– located in the South-Eastern administrative district of Moscow. Its main part is located within the boundaries of several districts: Yuzhno-Portovy and Pechatniki. The main connection with the city, providing transport services to the territory under consideration, is Yuzhnoportovaya Street with access to the Third Ring Road.

Along Yuzhnoportovaya Street organized bus routes transporting passengers (district, interdistrict) and transportation of the population to the Kozhukhovskaya metro station and in the opposite direction along Sharikopodshipnikovskaya Street to the Dubrovka metro station. Within the project boundary is the final turning circle of the tram line running along Ugreshskaya Street and then through the third transport ring along Sharikopodshipnikovskaya Street to the Dubrovka metro station.

At the Ugreshskaya transport hub, 2 passenger terminals of 1.5 thousand square meters each and an overhead pedestrian crossing with an area of ​​10.9 thousand square meters will be built. m. It is also planned to build a technological link from the northern passenger terminal of the Ugreshskaya transport hub to Volgogradsky Prospekt.
Transport:

  • Buses No. 154, 33, 603, 71, 195, 134, 185, 61, 628, 789
  • Trolleybus No. 38
  • Tram No. 20,40,43

Train schedule TPU Dubrovka

– located in the South-Eastern administrative district of Moscow and is located within the boundaries of the Yuzhno-Portovy and Pechatniki districts.

The Dubrovka transport hub will provide a transfer to the Dubrovka station Lyublinsko-Dmitrovskaya line of the Moscow metro, as well as on ground urban passenger transport. The final turning circle of the tram line running along Ugreshskaya Street is located within the project boundary.

Transport:

Train schedule TPU Avtozavodskaya

– located in the Southern Administrative District of Moscow, in the Danilovsky district. The main planning and transport connections are Avtozavodskaya Street, Third Transport Ring, 1st and 2nd Avtozavodskaya passages, 1st and 2nd Kozhukhovsky, st. Lobanova, st. Trofimova.

The Avtozavodskaya transport hub will provide a transfer to the Avtozavodskaya station Zamoskvoretskaya line of the Moscow metro, as well as on ground urban passenger transport.
Transport:

Train schedule TPU ZIL

– located in the northern part of the Southern Administrative District of Moscow in the Danilovsky district.
On the territory of the ZIL transport hub there will be two terminals with ticket offices and turnstiles - southern and northern, on the outer and inner sides of the MCC. In addition, it is planned to construct an administrative and business building with retail facilities, parking facilities, and above-ground and underground parking. For public transport, a settling and turning area will be organized on the western side of the MCC and a road network will be developed.

The transport hub project provides for the construction of a northern technological connection with the installation of ticket offices and turnstiles, providing access from the north-eastern terminal towards the territory of the Ice Palace (inner side from the MCC) and to the boarding fronts for ground urban passenger transport (outside the MCC); southern technological connection with the installation of ticket offices and turnstiles, providing access from the southwestern terminal to the public and business zone complex (inner side from the MCC) and to the industrial territory of AMO "ZIL" (outside from the MCC); flat dual-use parking with a total capacity of 120 cars for the needs of the ZIL transport hub and visitors to retail and office facilities; placement of settling and turning areas for urban passenger transport on both sides of the railway
Transport:

  • Buses: new routes (clarification)

Train schedule TPU Verkhniye Kotly

– located in the Southern Administrative District in the Donskoy, Nagatino-Sadovniki and Nagorny districts.

On the Moscow Central Circle located between the Tulskaya and Nagatinskaya stations Serpukhovsko-Timiryazevskaya metro line and the stopping point “Nizhnie Kotly” of the Paveletsky direction of the railway.

After the launch of traffic along the MCC, the Verkhnie Kotly transport hub will provide a transfer to ground urban passenger transport. In 2017 From this transport hub there will be a transfer to the Paveletskaya direction of the Moscow Railway, for which a new platform will be built.

From the north, the territory of the transport hub is adjacent to a residential microdistrict and enterprises of the Varshavskoye Shosse industrial zone. From the south - the coastal zone of the Kotlovka River and the enterprises of the Varshavskoye Shosse industrial zone.

Transport:

  • Buses No. 25, 44, 142, 147, 275, 700
  • Trolleybus No. 1, 1k, 40, 71, 8
  • Tram No. 16, 3, 35, 47
  • Suburban railway transport Paveletskaya direction of the Moscow Railway (promising, 2017)

Train schedule TPU Krymskaya

TPU "Krymskaya"– located in two administrative districts, Southern and Southwestern, in the Donskoy, Nagorny and Kotlovka districts.

The main transport connections are: Sevastopolsky Avenue, Zagorodnoye Shosse, 4th and 5th Zagorodnye Proyezds, Bolshaya Cheremushkinskaya Street. The basis of the formed interchange hub is the designed railway station “Sevastopolskaya” (second stage of construction) and ground urban passenger transport serving this territory along Sevastopolsky Avenue. An overground pedestrian crossing with exits to the railway platform will be built between 4th Zagorodny Proezd and Sevastopolsky Prospekt. Also, as part of the preparation for the launch of traffic around the ring, a reconstruction of the surface urban transport stop along the 4th Zagorodny Proezd will be carried out with the installation of a drive-in pocket.

From the north, residential areas of the Donskoy district adjoin the territory of the transport hub. To the south are the residential areas of the Kotlovka district, and to the west of Sevastopolsky Prospekt are the enterprises of the Varshavskoye Shosse industrial zone.
Transport:

  • Buses No. 121, 41, 826
  • Trams No. 26, 38

Train schedule TPU Gagarin Square

TPU "Gagarin Square"– located in the Western administrative district of Moscow within the boundaries of the Academichesky district. The main planning and transport connections of this territory are the Third Transport Ring, Leninsky Prospekt, 60-Letiya Oktyabrya Avenue and Vavilova Street.

The Gagarin Square transport hub will provide a transfer to the Leninsky Prospekt station Kaluzhsko-Rizhskaya line of the Moscow metro, as well as on ground urban passenger transport. “Gagarin Square” is the only station on the MCC located underground. The transition to the Leninsky Prospekt metro station will be via an underground pedestrian crossing.

Transport:

Train schedule TPU Luzhniki

– located along the street. Khamovnichesky Val, in the Khamovniki district of the Central Administrative District. The stopping point consists of two shore-type landing platforms and a ground-based vestibule with access to the street. Khamovnichesky Val.

Transport hub "Luzhniki" will provide a transfer to the station "Sportivnaya" Sokolnicheskaya line of the Moscow metro, as well as on ground urban passenger transport. The Luzhniki transport hub will become the main transport hub of the main arena of the 2018 FIFA World Cup.

Transport:

Train schedule TPU Kutuzovskaya

– located in the Western Administrative District of Moscow within the boundaries of the Dorogomilovo district. The main highways providing transport services to the territory are the Third Transport Ring and Kutuzovsky Prospekt.

The Kutuzovskaya transport hub will provide a transfer to the Kutuzovskaya station Filyovskaya line of the Moscow metro, as well as on ground urban passenger transport.

Transport:

Train schedule TPU Business Center

– located in the southwestern part of the Central Administrative District of Moscow in the Presnensky district. Presnensky District borders on the following districts: Khoroshevsky, Khoroshevo, Mnevnikovsky, Filevsky Park, Tverskoy, Dorogomilovo, Begovoy District and Arbat.

It will be one of the largest on the MCC. He will connect the Mezhdunarodnaya metro station and the Delovoy Tsentr stop point in a warm circuit on the MCC. Walking communication will be provided to the Testovskaya platform in the Smolensk direction.

It is planned to build a parking lot, an underground passage from the Business Center transport hub to Moscow City, and an above-ground pedestrian gallery from the Business Center transport hub directly to the Moscow City building (above Testovskaya Street). The elevated pedestrian crossing will be built in the second stage.

The transport hub includes the construction of an office center and parking areas (second stage). The total construction area is 151 thousand sq. m.
A terminal with ticket offices and turnstiles is being built under the overpass of the Third Transport Ring, which will be connected to the northern pavilion of the International metro station. Thus, From the Delovoy Tsentr MCC station you can immediately go down to the metro lobby, and also go out onto Testovskaya Street to stops of ground urban transport, or through an underground pedestrian crossing to Moscow City. There will also be an exit to the opposite side of the transport hub to the Botanical Garden.

Transport:

Train schedule TPU Shelepikha

TPU "Shelepikha"– located in the Central Administrative District of Moscow within the boundaries of the Presnensky district. The main planning and transport connections are the MCC, the Smolensk direction of the Moscow Railway, Shmitovsky proezd, Shelepikhinsky dead end and Ermakova Roshcha street.

The MCC is essentially the second ring metro line with a unified tariff ticket system of the Moscow Metro. 31 stations (TPU) were built on the MCC. From any transport hub it is possible to transfer to ground urban passenger transport.

At 17 out of 31 stations it is possible to change to 11 metro lines. Also, at 10 transport hubs you can transfer to commuter trains.

The rolling stock on the MCC is represented by high-speed electric trains "Lastochka" manufactured by Siemens AG. Trains consist of 5 cars.
Operation of the electric train is possible at ambient temperatures from −40°C to +40°C. The cars are equipped with double-leaf sliding doors, two on each side of the car.


The electronics of the cars contain built-in lighting, loudspeakers, and digital information displays. To recharge mobile devices, the carry-on luggage compartments have built-in electrical sockets designed for 220v AC voltage.

The head carriages of the train have bathrooms with dry toilets.(one per carriage), the bathrooms are equipped with special equipment for people with limited mobility.
There are 28 Lastochka high-speed electric trains running on the MCC. The train moves almost silently and can accelerate to 120 kilometers per hour. During peak hours, trains run every six minutes, at other times - at intervals of 11–15 minutes. The total duration of the trip around the ring is about 75-85 minutes.

Technologies

"Smart" escalators with motion sensors

Energy-saving escalators have been installed on the Moscow Central Circle (MCC). Smart escalators start moving only when passengers approach them. Accordingly, if there are no passengers on the escalator, it automatically slows down and stops.

Opening doors “On demand”

Doors on trains open at the request of passengers. The doors open only when the train is completely stopped on the platform, and only when the doors are ready to open, and a special green signal lights up.


There are special stickers on the outer and inner sides of the doors informing that before entering or exiting, you must press the corresponding button to open the doors.

Thermal curtain / Climate control system

In cold weather, electric trains on the Moscow Central Circle will include a thermal curtain on the doors. The thermal curtain turns on automatically at stops, when the doors are opened.

“Warm air is exhausted directly in front of the doors in the car, creating a thermal curtain and preventing cold air from entering inside,” the press service of JSC Russian Railways.

The thermal curtain will protect the carriage from sudden temperature changes and will be able to maintain a comfortable temperature for passengers at any time of the year.

MCC cars have an automatic heating system that turns on when the ambient temperature drops below the air temperature in the train. An antibacterial air disinfection system is integrated into the climate control of trains, which will protect passengers from all kinds of infections and viruses in the carriages, which is undoubtedly a relevant technology. solution for public transport