CSKA Arena (VTB Ice Palace). New Dynamo stadium in the VTB Arena Park complex: photos, videos, opening May I live like this

Restate's opinion

March 2018 “VTB Arena Park” is not just a complex of apartments, it is part of the development of the territory of the Dynamo stadium, accordingly, the market status and a number of consumer characteristics are directly related to the fate of the stadium itself. And as of 2018, this stadium is preparing to become a training ground for the World Cup, which will be held in Russia this year. Despite the fact that the championship itself will not be held at the Dynamo site, all this will lead to a significant increase in the popularity of the stadium, and in fact its reconstruction was timed to coincide with the special occasion. The best PR for the multifunctional complex VTB Arena Park", of which the business class apartment complex will be a part - is it necessary to clarify that it is also planned to be commissioned in 2018? The apartments must be prepared and adapted in order to receive guests of the capital: they are rented with fully furnished, the complex will also provide hotel services from the famous hotel franchise Hyatt Regency. It is clear that 2018 will pass, and the apartments will remain, but they are firmly connected with the stadium and sports complex, so surges of interest and popularity will happen here regularly , local apartments will certainly be profitable to rent out for the season. But for permanent residence they are suitable for active and young people; family buyers may be scared off by the close proximity to Dynamo - crowds of spectators and fans for each match can make it difficult for a family to live a quiet life in " Arena Park." We also note that since 2014, real estate prices in the complex have risen by at least 2 million rubles, possibly due to the proximity of the World Cup.

Ecology The ecological situation can hardly be called favorable, primarily due to the proximity of major transport routes. But it is worth noting that the complex is being built almost on the border of Petrovsky Park, the developer assigns great importance to landscaping areas, which, of course, , will have a positive impact on the environmental situation and quality of life of residents. Transport and infrastructure The complex has excellent transport accessibility, next to the complex there is Leningradsky Prospekt, a transport interchange at the intersection of Leningradskoye Shosse and Begovaya Street, and the Savelovskaya overpass. Just 400 meters from the complex is the Dynamo metro station. Infrastructure The area is very well developed, within walking distance - kindergartens, schools, sports schools, medical institutions, Dynamo stadium, shops, supermarkets, cafes, clubs. In addition, it is planned to create the complex’s own infrastructure, which will include retail, hotel, and office areas, including a cinema, restaurants, cafes, sports schools, and a sports museum.

November 2014 According to the developer, VTB Arena Park should become a comfortable place for living and working for people who love comfort, ecology and sports, and at the same time should be located near the city center and be mobile in their movements. The emphasis on sports is quite unusual and new for new buildings in the capital, and will probably find many responses not only among professional athletes, but also among ordinary citizens who adhere to an active lifestyle. Apartments ranging from 49 to 371 (penthouses) sq.m. are offered for sale. Among the many advantages of the complex (developed infrastructure, excellent transport accessibility, interesting project concept), the main disadvantage is the price - it is relatively high for apartments and suggests alternative options in other residential complexes in Moscow, where you can get permanent registration, but such infrastructure and concept from You shouldn't expect a complex. At the moment, the most inexpensive apartments (49 sq.m., 2nd floor) cost 10 million rubles, and the most expensive (371 sq.m., 25th floor) cost 215 million rubles.

The reconstruction of the Dynamo stadium is one of the largest projects in the north of Moscow. Back in 1928, when the stadium was built, this area was essentially a suburb. And now it is considered quite a center.

"VTB Arena Park" is a project for the integrated development of the territory, including the construction of a multi-purpose sports and entertainment complex (VTB Arena and the Dynamo Central Stadium), the Dynamo Sports Academy, the Arena Park city block, as well as a sports park "Dynamo". The area of ​​the project being implemented is about 32 hectares.

On the day of shooting, the weather was completely unflyable for the drone, and the scale of construction of such an object is difficult to assess from the ground. So a couple of days later, when the sun came out, I returned to the stadium and filmed it from the air.

As I already said, the stadium was built in 1928 and since then it has been completed several times and reconstructed twice. The stadium underwent a major reconstruction on the eve of the 1980 Olympics, the last one before its closure on the eve of the World Youth Games in 1998. Today Dynamo is experiencing the largest reconstruction in its history, the scale and tasks this time are much more serious and impressive.

And if in past reconstructions they cared little about preserving the historical heritage (in the process of studying the former structures of the stands, new constructions and traces of reconstruction of structures were constantly found), now the task is to preserve the historical western wall of the stadium, which has had the status of an architectural monument since 1987. Also, special attention will be paid to the restoration of the bas-reliefs of the outstanding Soviet sculptor Sergei Merkurov, which adorned the northern and southern porticos of the stands for more than 80 years.

The remaining facades will be restored based on the results of measurements and a comprehensive study.

Now let's go to the facility and see what's happening there.

1. The last match at the stadium was played in November 2008, at which time the dismantling of concrete structures began. VTB entered the project only in 2010. At first there was a very long period of approvals, transfer of communications, dismantling of the stadium and its foundation.

2. The project is the winner of a large number of different prestigious awards in different categories.

3. It was initially assumed that the new Dynamo stadium would be included in the bid book for hosting matches of the 2018 World Cup, but this did not happen, and its capacity was reduced from the planned 45 to the final 27 thousand spectators. The project was integrated into the contours of the old stadium, the geographical orientation of the field remained the same. The exclusion of the stadium from the bid book, according to project representatives, made it possible to “compress” the shape of the arena, making it more compact and comfortable. Although there is some disappointment that the oldest existing stadium will not host World Cup matches.

4. The most important change is that previously there was only a football stadium within the perimeter walls. And now a multifunctional arena, a commercial level (shops, etc.), the Dynamo Museum, underground parking and much more will be added to it. Thus, the complex will meet all the most modern requirements.

5. The football field itself is now raised 8 meters above the ground. Previously, it was “recessed” by about half a meter.

6. Work is now being carried out around the clock.

7. Active construction work on the sports part of the project began in July 2014.

8. The preserved western stand and former commentary booths.

9. Load-bearing structures will be strengthened, the stand will become part of the complex. The western façade will become the main entrance to the arena.

10. The total capacity of the football stadium will be 26,319 seats, and the capacity of the multi-purpose arena will be from 11,500 to 14,000, depending on the configuration - hockey, basketball or concert.

11. A giant screen will be placed on the western facade facing Leningradsky Prospekt.

12. The roof itself will be made of special materials (polycarbonate) that transmit light. In addition, LED strips will be built into it, which at night will allow the dome to be used as a media facade of a huge area.

13. Future ramps for access to the field, to service premises, and so on.

14. The lawn, of course, will be natural.

15. On this slab there will be a special layer cake one and a half meters high with a lawn life support system. The tubes that stick out of the concrete are just part of it.

16. The opening of the renovated Dynamo stadium will be marked by the first football match, which is scheduled for Lev Yashin’s birthday, October 22, 2017.

17. The Dynamo Sports Academy will be located nearby. Sports and training complex with a total area of ​​62,800 sq. m includes two hockey rinks, a gymnasium, halls for martial arts, squash, team sports, fencing, and a medical and rehabilitation center.

18. After reconstruction, the stadium will be called “VTB Arena - Central Stadium “Dynamo”.

19. Place of planning meetings on the construction site.

20. And some renderings of what it will all look like. The Arena itself, the park and the city block. Among the park you can see the Sports Academy with a green roof.

21. That same huge media screen.

22. To implement the project in 2011, the international architectural bureau Manica Architecture, headed by the American architect David Manica, was hired.

23. Universal arena - hockey rink.

24. Basketball version of the VTB Arena configuration.

25. And a concert venue. Since the late 1980s, the stadium has been used for concerts. On July 23, 1996, Deep Purple's first concert in Russia took place here. The Michael Jackson concert, given as part of the HIStory world tour and held on September 17 of the same year, became the largest event in the history of the stadium: 71 thousand spectators were seated in the stadium bowl.

26. In the foreground is the pit of the Petrovsky Park station. The Moscow Construction Complex plans to complete the construction of this station in 2016. The station is part of the first section of the TPK and will be an interchange with the Dynamo station. So the transport accessibility of the capital’s new sports facility will be excellent.

27. To the right of the station pit is the transition to the Dynamo station.

28. As you can see, the inclined course has already begun to take place.

29. General view of the construction site.

30. “VTB Arena - the central Dynamo Stadium.”

31. Thanks to the press service of the VTB Arena Park project for their help in organizing the shooting!

In Russia, stadiums are one of the main long-term construction projects. Compared to other arenas, Dynamo is not the worst option. The old stadium in Petrovsky Park closed for reconstruction almost exactly 9 years ago. Since then, the reconstruction format, the developer, and the project itself have changed. The planned capacity was either increased for the 2018 World Cup or reduced when the arena was not included in FIFA's final bid.

In general, a lot was happening around the construction site, so the very news that it is nearing completion cannot but rejoice. Since the start of active work at the arena, a specific opening date has been announced year after year - October 22, 2017, Lev Yashin’s birthday. Even this year, no one has officially renounced it. Dynamo's opponents in the opening match were matched with one European giant, then another.

As a result, we limited ourselves to a rather intimate event (safety standards do not allow more - this is still an active sports ground) event, which can appropriately be called the presentation of the bowl of the new stadium. The readiness there is such that, if desired, one could play a match. Tribunes with chairs, lawn, goals - everything is in place. The only mandatory attributes missing are a scoreboard and benches.

However, the VTB Arena Park complex is not only a football stadium, but also a small sports arena, where hockey Dynamo and basketball CSKA will play, and a shopping and entertainment center. Everything must be submitted at once, so you will have to wait. And the finishing of the facades and dome still needs to be done.

In general, the current deadlines are as follows: in April 2018 - commissioning of the facility and the first test events, both for the anniversary of the Dynamo society and non-sports, in June - the first official match with the participation of the Russian national team, in July - moving here Moscow Dynamo. On June 5, the national team can play here with Italy - if the squadra makes it to the World Cup. And this will be the team’s last match before the home World Cup. Member of the board of trustees of the Dynamo society Sergey Stepashin He also announced the possibility of holding some kind of opening of the World Cup in the arena.

Photo: Alexander Safonov, “Championship”

Today we have an intermediate checkpoint, by Yashin’s birthday we have completely completed the main work at the football stadium, only the scoreboard and finishing of the boxes remain,” stated the senior vice president of VTB Bank, head of the VTB Arena Park project. Andrey Peregudov.

- What is the final cost of the project?
- We have not gone beyond the standards for this level of stadiums: the cost of one seat in a football arena is within 5 thousand euros and 10 thousand euros for a seat in a universal sports complex. Plus we also have a shopping and entertainment center, which should also be completed in the spring. This is all one stage of construction, so the entire complex should be completed in the spring, so that next season not only football Dynamo, but also hockey and basketball CSKA will play here.

- Is the capacity of 26,700 spectators sufficient for such a stadium?
- This is much more than the average attendance of the RFPL. We hope that the arena will be well filled and that the World Cup will give impetus to the growth of spectator interest. As does the factor of a new stadium for fans.

Veterans of the club, current players and students of the club’s academy took part in the ceremonial events at Dynamo. The symbolic first blow to the ball in the new arena was struck three times: first by the veteran Valery Urin, the last of those who played with Yashin, then Dynamo's top scorer in recent seasons, and then 11 young players from the blue and white school.

Panchenko conceded the right to strike the first blow. Everyone was afraid for Kirill’s leg, because he had only recently undergone surgery on the crosses. But the forward assured: everything is fine.

It wasn’t difficult for me, my leg doesn’t hurt, everything is fine. It is very honorable to be the first to strike on such a day and at such a legendary stadium. Today is Lev Yashin's birthday, and this is a special day. Yashin is a true legend. There were questions about who to beat - me or Anton Shunin. But Anton is our goalkeeper, it’s somehow wrong for him to shoot into his own goal. And my job is to score goals. That's why I hit, Anton gave in to me.

That evening Shunin probably took about a hundred selfies with all the guests of the ceremony. Fans, veterans, journalists - everyone wanted to express their admiration for yesterday's crazy saves in the match with Rubin. Yashin would be pleased with his successor. By the way, Shunin is the only one in Dynamo who remembers the last match at the old stadium in 2008.

Then, of course, I didn’t expect that everything would drag on for almost 10 years,” the Dynamo captain told the Championship. “But now we don’t have long to wait.” Everything is almost ready - I would be ready to play here. I just want to go see the locker rooms (laughs). Well, we'll wait until next year to start playing here. My father is a long-time Dynamo fan, he will be happy to come here next season and see me, hopefully, play in the new stadium. It will be a special moment for me.

Well, the opening match on Yashin’s birthday did not take place. But there is no doubt that the greatest and most humble goalkeeper in the history of football would not be at all upset that the games in the new arena will start on another day. After all, the upcoming 95th anniversary of Dynamo and the 90th anniversary of the stadium in 2018 are also beautiful dates.

The city quarter “VTB Arena Park” is part of a project for the integrated development of an area of ​​about thirty hectares in the Northern Administrative District of the capital. The project is being implemented by the Dynamo Management Company.

The business class quarter consists of several buildings of variable number of floors - from twelve to twenty-five floors. The construction of the complex is carried out using advanced European technologies. The complex has designed apartments, the area of ​​which varies from 44.2 to 373.9 square meters, there are lots with glazed winter gardens. In total, the quarter is designed to accommodate three thousand people.

Each building has its own yard with a protected area. The first floors of the houses according to the project are not residential. It houses strollers, spacious elevator halls, commercial organizations and household services. The complex is maintained by its own operating organization - Arena Park Management.

The multifunctional complex, in addition to apartments, includes shopping, hotel, and office areas. The project includes the VTB Arena and the central Dynamo stadium, the Dynamo Sports Academy. There will also be a sports museum, a cinema, cafes and restaurants, and shops located on the territory of the multifunctional complex.

The complex is located near the intersection of the Third Transport Ring and Leningradsky Prospekt, which provides it with good transport accessibility. The station is within walking distance from the complex.

The ecological situation in the area where the multifunctional complex is located is relatively good. The proximity of transport interchanges is compensated by park areas located next to the multifunctional complex.

The complex is located in an area with developed social infrastructure. Within walking distance are kindergartens, schools, hospitals, shops, bank branches, post office, cafes, etc.

CSKA Arena (until August 2018 it was called VTB Ice Arena) is the most modern arena in Russia. This is the first Ice Palace in Russia, housing 3 arenas under one roof. Since 2015, it has been home to Dynamo Moscow, and from 2018, two capital teams - CSKA and Spartak - will play home matches at the arena. On the ice of the small ice arena, players of the Youth Hockey League club MHC "Spartak" train and receive their rivals. The arenas are also the home base of the Russian national hockey team.

The Ice Palace hosts the most significant events from the world of sports and beyond:

  • GAMES OF THE REGULAR KHL CHAMPIONSHIP
  • KHL STAR GAME
  • CHANNEL ONE HOCKEY CUP
  • ILYA AVERBUKH SHOW
  • INTERNATIONAL JUDO TOURNAMENT AMONG POLICE AND ARMY
  • FIGHT FOR THE WORLD SUPER CHAMPION TITLE ROY JONES VS ENZO MACCARINELLI
  • ICE HOCKEY WORLD CHAMPIONSHIP

Big Arena - Main Arena of the World Hockey Championship

  • Capacity -12,100 spectators
  • Upper level - 5,000 people
  • 2 levels of VIP boxes - 1,600 people
  • Lower level - 5,500 people

Small arena

  • Capacity - 3,000 spectators
  • Conference room with a capacity of 30 people
  • Octagonal media cube with an area of ​​45 sq. m.
  • Sports and concert sound reinforcement system


The large and small arenas can be transformed to host competitions in other sports and concert show programs, and their capacity can increase to 14,000 and 5,000 spectators, respectively.

HOW TO GET THERE

CSKA Arena located in the area of ​​the former ZIL automobile plant in Moscow, within walking distance from the Avtozavodskaya metro station on the Zamoskvoretskaya metro line (green line) or the ZIL MCC station.

How to get there by metro

From Avtozavodskaya metro station: the first car from the center, from the glass doors to the left towards the third transport ring, follow to the elevated pedestrian crossing. Follow it to the opposite side and follow the sign straight to “ Park of Legends».

From MCC station "ZIL": from the glass doors turn left, then go straight, before the Water Sports Complex turn left and follow until CSKA Arena.

How to get there by ground transport

From Avtozavodskaya metro station: public transport stop "Avtozavodskaya", the last car from the center, from the glass doors after the turnstiles to the left. Buses № 9 , trolleybuses № 26 And 67 to the stop " Park of Legends».

From Tulskaya metro station: bus № 9 to the stop " Park of Legends».

How to get there by car

The large and small ice arena is located at: MOSCOW, ST. AVTOZAVODSKAYA, VL. 23

Exit from the outside of the third transport ring at the sign “Welcome to the Park of Legends.”

From the inside of the third transport ring: follow to the Avtozavodsky Bridge, then turn right, turn around under the bridge, get to the outside of the third transport ring and follow the sign “Welcome to the Park of Legends”.

Parking lots of the Big and Small Sports Arena

  • FIXED RATE - 200 RUBLES / 1 DAY.
  • At each parking level there are 2-3 parking meters with the possibility of paying both in cash and by bank transfer
  • The free period of stay in the parking complex is 15 minutes
  • The maximum time spent in the parking complex after payment is 60 minutes
  • For the loss of a ticket there is a fine of 1000 rubles

What should you not bring to the ice rink?

It is PROHIBITED to bring into the arena territory:
Weapons of any type, ammunition, piercing, cutting, throwing objects, gas cartridges. It is prohibited to bring items that could be used as weapons, including umbrellas, canes and helmets.
Flammable and pyrotechnic products, regardless of type and purpose, including smoke bombs, flares, signal flares, firecrackers, explosive, toxic, toxic substances, radioactive materials, flammable and combustible liquids.
Bottles, cups, jugs or jars, including cans, items made of polyester, glass or any fragile material, as well as tetra packs.
Alcoholic drinks, narcotic and toxic substances and stimulants.
Propaganda materials of an extremist nature.
Nazi paraphernalia or symbols, or paraphernalia that is confusingly similar to Nazi paraphernalia.
Technical means that can interfere with the match or its participants (laser devices, flashlights), sound amplification equipment, radio stations, vuvuzelas.